Recent shed moves

    16x8 Shed Repositioned Before the Rain in Spring Branch

    Spring Branch, TXOnsite Reposition16x8

    With storms rolling in, we moved Laura's 16x8 shed start up to 7:30 AM so the yard wouldn't turn to mud. Chris had it repositioned and dialed in perfectly level — about an hour and a half, start to finish.

    • Start moved up to 7:30 AM the night before to beat incoming rain.
    • Repositioned the 16x8 shed on the same property in about 1 to 1.5 hours.
    • Leveled it and waited for the homeowners' final sign-off.
    Shed moving in the San Antonio area
    16x8 shed repositioned in a Spring Branch TX backyard
    Reset level before the storms rolled in
    16x8 shed reset level on blocks in Spring Branch TX
    Reset level on blocks before the rain